Francis Turbine Test Rig
Categories:Experiment:To study the operation of a Francis TurbineTo determine the Output Power of Francis TurbineTo determine the Turbine EfficiencyUtilities Required:Water Supply and DrainElectricity 15 kW, 44...
Product
Description
Experiment:
- To study the operation of a Francis Turbine
- To determine the Output Power of Francis Turbine
- To determine the Turbine Efficiency
Utilities Required:
- Water Supply and Drain
- Electricity 15 kW, 440V AC, Three Phase
- Floor Area 1.5 x 0.75 m
quick overview :
Experiment:
- To study the operation of a Francis Turbine
- To determine the Output Power of Francis Turbine
- To determine the Turbine Efficiency
Utilities Required:
- Water Supply and Drain
- Electricity 15 kW, 440V AC, Three Phase
- Floor Area 1.5 x 0.75 m
Product
Reviews
add Review
reviews
No Review Yet.
Product
Reviews
add Review
reviews
No Review Yet.